
Service
Basement Suites
A legal basement suite adds rental income and real value to a house you already own. We handle the code requirements, the permits, the construction and the inspections across Surrey and the Lower Mainland.
Get a Free QuoteWhy a Legal Suite Is Worth More Than an Unpermitted One
An unpermitted suite rents for less, carries more risk and can cost you money at the worst possible time. Insurers can decline a claim on work that was never permitted. Lenders and appraisers generally will not count rental income from a suite that does not legally exist, which affects what the house is worth and what you can borrow against it. A buyer's lawyer will find it. Municipalities do respond to complaints, and an order to remove a suite is expensive and disruptive. A legal suite is the opposite. It is documented, inspected, insurable, financeable, and it shows up in the value of the property. Tenants take it more seriously as well, because a permitted suite means proper egress, alarms and separate ventilation, and those are the things that make a basement feel like a home rather than a finished storage area. The extra cost of doing it under permit is smaller than most owners expect.
BC Building Code and Municipal Requirements
Secondary suites in this province are governed by the BC Building Code, and each municipality layers its own requirements on top through zoning and bylaws. The recurring items are consistent even though the specifics differ. Minimum ceiling height, which is the requirement that most often decides whether an older basement can hold a suite at all. Egress windows in every bedroom, sized and positioned so someone can get out and a firefighter can get in. Fire separation between the suite and the main dwelling, typically rated assemblies on the ceiling and any shared walls, with rated doors where needed. Interconnected smoke alarms, so an alarm in one unit sounds in the other. Separate heating and ventilation for the suite, which usually means the suite does not share ductwork with the house. Parking, and in many municipalities a limit on suite size relative to the main house. Numbers and details vary between cities and they get updated, so we confirm the current requirements for your municipality before we design anything.
The Construction Work Involved
Most of the work happens before anything looks finished. Framing and layout come first, and in a basement that means working around existing posts, beams, ducts and drains that cannot simply be moved. Where headroom is short there are two options and both are significant. Lowering the floor, by excavating and repouring the slab, or underpinning, which means extending the existing foundation deeper in sections so the floor can be dropped without undermining the house. Both require structural engineering and both add real cost and schedule, but on a house with a low basement they are the only way to get a legal suite. From there the sequence is plumbing and drainage for the new bathroom and kitchen, which often means breaking the slab to run drains, then electrical, then the separate heating and ventilation system, then the fire separation assemblies, insulation, drywall and finishing. A separate entrance is usually part of the job, and that can mean excavating and forming an exterior stairwell with proper drainage.
Moisture, Drainage and Perimeter Drains
Lower Mainland basements deal with a lot of water. Rain is steady for months, the water table sits high in some neighbourhoods, and many houses here are old enough that the original perimeter drain has failed or filled with silt and roots. Finishing a basement over a moisture problem is the most expensive mistake in this trade, because the framing, insulation and drywall all have to come back out to fix it. So we look first. Signs of past water at the slab edge, efflorescence on the walls, damp in the corners, the condition and slope of the grading outside, where the downspouts discharge, and whether the perimeter drain is doing its job. Replacing a failed perimeter drain means excavating around the foundation, installing new drain tile, gravel and filter fabric, and dealing with the waterproofing on the foundation wall while it is exposed. Sump pumps, interior drainage and proper vapour control at the slab and walls are the other tools. Fix the water first, then build.
The Permit and Inspection Process
The process starts with a check of your zoning, because not every property permits a secondary suite and some carry conditions. Then drawings. A suite permit application usually needs a floor plan showing the layout, room sizes, window sizes and locations, the fire separation assemblies, alarm locations, and the mechanical plan for separate heating and ventilation. The municipality reviews the application and may ask for changes. Once the permit is issued the work is inspected in stages, commonly at framing, plumbing rough in, electrical, insulation and vapour barrier, and then a final inspection before the suite can be occupied. Electrical is permitted and inspected under its own process. We coordinate the trades so each stage is ready when the inspector arrives, because a failed or missed inspection is the most common cause of delay on a suite project. At the end you have a file at city hall that says the suite is legal.
Rental Income and What Drives Cost
A legal one or two bedroom suite in the Lower Mainland brings in steady monthly rent, and that income is what pays the project back over time and what a lender will consider when you refinance. The build cost varies more than people expect, and it comes down to a few things. Ceiling height, because underpinning or lowering the slab is the single biggest swing. Whether the perimeter drain and moisture control need work. How far the new bathroom and kitchen drains sit from existing plumbing, and how much slab has to be broken to reach it. Whether a separate exterior entrance has to be excavated and formed. The separate heating and ventilation system. Egress openings cut into concrete. And the finish level, which for a rental should be durable and easy to repair. We inspect, scope the work and give you a written fixed price.

What We Offer
Where We Offer Basement Suites
We provide basement suites across Greater Vancouver from our home base in Surrey. Choose your city for local detail on permits, housing stock, and what drives cost where you live, or contact us for a free quote anywhere in the region.
Ready to Get Started?
Contact us for a free consultation and quote on your basement suites project.
Request a QuoteCall: +1 (778) 861-6482
Email: info@oldtonew.ca
FAQ
Frequently Asked Questions
What makes a basement suite legal in BC?
My basement ceiling is too low. Can anything be done?
Does the suite need its own entrance?
How much does a basement suite cost?
Will the suite share the furnace with my house?
Is my property even allowed to have a suite?
Let's Discuss Your
Basement Suites Project
Get a free consultation and detailed quote. We are ready to bring your vision to life.
Contact Us Today